Prepping, Painting, and Building
We’ve been busy. Over the last few weeks we’ve been prepping the space while the our permit was being finalized by the city. We’ve attached some pics to show you the development. First, we did some extensive drywall repair(those 20 foot ceilings are pretty tall) before being able to lather it with primer. Priming and Painting those huge walls was no small task, but as you can see from the picture of Jud, we tried to have a little fun with it. After much of the painting was done, the walls were prepped for the wet area to put up FRP(fiberglass reinforced plastic) panels to waterproof the area where the tanks and brewhouse will go.
Now that all the prep work is mostly done, we’re looking forward to the next major phase in the buildout. Next up, we’ll have plenty of pics of our progress as we cut up the floors and dig out the plumbing for our trench drains and misc plumbing. Stay tuned for more updates as they come.