Electric Plumbing Begins
Things are moving along and moving along quickly. First thing’s first, we saw cut the concrete to prepare for our brewery trench drainage. Since we finished prepping the area and putting up the FRP on the brewery side, we were ready to slice into the concrete, dig it up and find and tap into the sewer lines.
The concrete was hard and thick and the main sewer line was 5 and 1/2 feet down, but we got there. After all the hard labor was through, we tapped into the line and ran the PVC for our three trench drains and misc plumbing. The rough-in went without a hitch and we are ready for the next step, pouring back the concrete and finishing out the water lines.
Meanwhile, we have been upgrading the electric service, since all those pumps and compressors use some serious juice. We are doubling our capacity from a 200 amp to a 400 amp to make room for our current needs as well as any future expansion requirements. More pics of the electric upgrade as they come.
Keep checking back, many more pictures and progress to come. We’ve got the finish out for plumbing and electric coming up as well as the pictures from the holy brewhouse unloading day.